| Period | Company/Position | Summary of activities performed relevant to the assignment |
| 09/2022 – Present | ESM Distribution of Heat DOOEL – Skopje Mechanical Design Engineer |
- Preparation of complete detailed design projects for district heating network construction or reconstruction according to valid standards. - Administrative documentation preparation for obtaining construction permit for DH pipeline network. - Preparation of energy consents for new connections to the DH network. - Selection and sizing of DH thermal substations for new consumers of thermal energy. - Evaluations for energy efficiency of specific area of DH network. - Working in various technical software’s for obtaining detailed design documentation, such as: Microsoft Office, ZULU Termo, AutoCAD, Solid Works, sisKMR, ROHR2, CAE PIPE, Danfoss Hexact, Audytor OCZ, Meteonorm etc. - Preparation of different types of manuals for district heating design developers. - Participation in various programs for professional development. |
| 03/2016 – 09/2022 | Distribution of Heat Balkan Energy DOOEL – Skopje Mechanical Design Engineer |
- Preparation of complete detailed design projects for district heating network construction or reconstruction according to valid standards. - Administrative documentation preparation for obtaining construction permit for DH pipeline network. - Preparation of energy consents for new connections to the DH network. - Selection and sizing of DH thermal substations for new consumers of thermal energy. - Evaluations for energy efficiency of specific area of DH network. - Working in various technical software’s for obtaining detailed design documentation, such as: Microsoft Office, ZULU Termo, AutoCAD, Solid Works, sisKMR, ROHR2, CAE PIPE, Danfoss Hexact, Audytor OCZ, Meteonorm etc. - Preparation of different types of manuals for district heating design developers. - Participation in various programs for professional development. |
| 03/2015 – 03/2016 | Distribution of Heat Balkan Energy DOOEL – Skopje Responsible Engineer for District Heating Network defect’s repair |
- Preparation of internal documents for defect repair approvals. - Organization of team work activities for district heating network defect repair. - Supervision and monitoring of working activities for DH network defects repairing. - Tracking the quantities of materials and securing the warehouse with minimal necessary quantities. - Compliance with standards and regulations in the scope of work. - Preparation of daily and monthly DH network defects reports. - Checking and control of tools and machine’s reliability needed for DH network repair. - Participation in the preparation of contracts for materials procurement and assurance of required quality. - Preparation of procedures, guides and other documentation in the working units. - Proposing measures for improving the working environment. |
| 10/2012 – 09/2014 | Geotherm Engineering Mechanical Engineer for HVAC-R Design and Installation |
- Design and construction of heating systems based on renewable energy, primarily water/water heat pumps. - Design and construction of refrigeration cooling and drying chamber for food products. - Preventive maintenance. - Ensuring high feasibility and efficiency of the designed systems through a detailed analysis of each part of the system. |
| Language | Verbal understanding | Speaking | Reading | Writing |
| Macedonian | mother tongue | mother tongue | mother tongue | mother tongue |
| English | 5 | 5 | 5 | 5 |
| Serbian/Croatian | 5 | 4 | 5 | 4 |
| Bulgarian | 5 | 4 | 4 | 4 |
| German | 2 | 2 | 3 | 3 |
| Spanish | 4 | 3 | 3 | 3 |
| No. | Year | Project Name | Assignments that Best Illustrates Capability to Handle the Assigned Tasks |
| 1 | March 2026 |
Detailed design for district heating network reconstruction of existing pipeline C1.020.030 from manhole 020 to manhole 060 on Vladimir Komarov street in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 300, route length, L=285m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 2 | February 2026 |
Detailed design for district heating network reconstruction of existing pipeline A1 from manhole 090 to manhole 10 on Kocho Racin boulevard in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 500, route length, L=64m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 3 | January 2026 |
Detailed design for district heating network reconstruction of existing pipeline B1.190 from manhole 160 to manhole 170 on Naroden Front street in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 450, route length, L=96m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 4 | November 2025 |
Detailed design for mechanical project for a steam boiler room construction in an industrial facility – juice production factory located on parcel KP 4565 in municipality of Resen. | Main project features:
Engineering design for steam boiler room with total capacity of 7300 kg/h steam production with parameters t=191°C and working system pressure of pw=8bar. Positions held: Revision of project documentation according to EN standards. Activities performed: - Compliance Check with EN Standards - Technical and Design Verification - Safety, Environmental, and Operational Assessment |
| 5 | October 2025 |
Detailed design for mechanical project for compressor station for juice production factory located on cadastral parcel KP 4565 in municipality of Resen. | Main project features:
Engineering design for compressor station with capacity of 140 m3/h. Positions held: Revision of project documentation according to EN standards Activities performed: - Compliance Check with EN Standards - Technical and Design Verification - Safety, Environmental, and Operational Assessment |
| 6 | July 2025 |
Detailed design for district heating network construction of secondary pipeline with dimension DN 125, dislocation from cadastral parcels KP 11614/1, 11614/2 at boulevard Sveti Kliment Ohridski 68 in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 125, route length, L=143m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. |
| 7 | April 2025 |
Thermotechnical project for building intended for collective residential housing - A2, on construction plot GP 5.36, located in Kisela Voda Municipality, Skopje | Main project features:
Engineering design for reliable energy efficient heating system. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. |
| 8 | October 2024 |
Detailed design for ventilation and smoke extraction for underground garage for new building planned for construction on building plot 6.7.14, cadastral plot 11055/5 located in cadastral municipality of Kavadarci in town of Kavadarci. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, total system smoke flow 21600m3/h, smoke duct length, L=450m. Positions held: Associate Mechanical Designer Activities performed: - Thermal and aerodynamic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 9 | August 2024 |
Detailed design for district heating network construction of secondary pipeline for new buildings according to Detailed Urban Plan for “Zlokukani” settlement in city of Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 200, route length, L=1670m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. |
| 10 | July 2024 |
Detailed design for district heating network construction of secondary pipeline (phase II) for new buildings according to Detailed Urban Plan for “Treska” settlement in city of Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 250, route length, L=624m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. |
| 11 | April 2024 |
Detailed design for ventilation and smoke extraction for underground garage for new building planned for construction on building plot 14.3.01 from the Detailed Urban Plan for urban unit number 14, block 14.3, cadastral plot 3901/1 located in cadastral municipality of Vatasha in town of Kavadarci. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, total system smoke flow 21600m3/h, smoke duct length, L=850m. Positions held: Associate Mechanical Designer Activities performed: - Thermal and aerodynamic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 12 | March 2024 |
Technical engineering solution for district heating pipeline dislocation from section D080 to section D110 on pipeline with mark E2.460, on street of Pitu Guli, near Heat Plant Vodno in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 200, route length, L=217m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals - Identify project risks - Monitor project progress - Manage project changes |
| 13 | September 2023 |
Technical engineering analysis for examining the possibility of delivering thermal energy from Skopje district heating network to district heating network located in Avtokomanda settlement, Skopje, R.Macedonia. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, consideration for DH thermal power increasing for 18MW. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. |
| 14 | August 2023 |
Detailed design for district heating main pipeline construction, with mark E2 from section in manhole 330 near Ministry of Economy of N. Macedonia to section in manhole 030 near street of Jurij Gagarin 35, Skopje, and additional secondary pipelines on the considered area. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 500, route length, L=474m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. - Identify project risks - Monitor project progress - Manage project changes |
| 15 | May 2023 |
Detailed design for district heating network construction of secondary pipeline A3.010 from section T27 along the street Lazar Dimitrov in municipality of Kisela Voda in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 150, route length, L=349m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. |
| 16 | February 2023 |
Detailed design for aboveground pipeline for paste backfilling transportation from plant for paste preparation to pit mine entrance “14B” and “Niskop Central” in mine plant SASA located in Makedonska Kamenica. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 150, PN160, route length, L=183m. Positions held: Chief Mechanical Designer Activities performed: - Hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Monitor project progress |
| 17 | November 2022 |
Detailed design for construction of district heating household connection for new building on cadastral plot 821 on street of Eseninova in municipality of Kisela Voda in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 65, route length L=25m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 18 | October 2022 |
Detailed design for district heating network construction of secondary pipeline C1.020.295 from new planned manhole 267 to manhole 030 near street Vangel Todorovski, Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 150, route length, L=250m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. - Identify project risks. - Monitor project progress. - Manage project changes. |
| 19 | October 2022 |
Detailed design for heating installation for “Partizan” sport hall located in cadastral plot 1127/1 in municipality of Karposh, Skopje, R Macedonia. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, Design heat load of building Q=265kW. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 20 | May 2022 |
Detailed design for district heating network construction of secondary pipeline B2.070.140.110 from existing manhole 290 to manhole 020 in Aleksandria settlement in municipality of Gjorche Petrov, Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 250, route length, L=293m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Monitor project progress - Manage project changes |
| 21 | March 2022 |
Technical engineering analysis for the assessment of the potential of integrating a independent pumping station and all necessary equipment into the thermal energy distribution network of the city of Skopje, near the cogeneration thermal power plant TETO – Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 700. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 22 | January 2022 |
Detailed design for district heating network reconstruction of secondary pipeline from section near street of Rajko Zhinzifof 18 to existing manhole 4679 near street of Rajko Zhinzifof 52 in Centar municipality in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 250, route length, L=450m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. - Identify project risks. - Monitor project progress. |
| 23 | October 2021 |
Detailed design for district heating network construction of secondary pipeline C1.020.180.040 near street of Eseninova in municipality of Kisela Voda in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 200, route length, L=127m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. - Identify project risks. - Monitor project progress. - Manage project changes. |
| 24 | March 2021 |
Complete engineering preparation of "District Heating Developers Manual - Guidelines for Design and Documentation for Heating systems and Sanitary hot water for facilities intended to connect to the district heating network", Skopje | Main project features:
Engineering design for reliable and optimal energy efficient thermal system. Positions held: Аuthor of the engineering and technical part of the Мanual. Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. |
| 25 | June 2021 |
Technical engineering analysis for the assessment of the potential for utilization of waste thermal energy from industrial and commercial facilities in vicinity of thermal distribution network in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, waste heat analyzed 1.5MW. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 26 | February 2021 |
Preliminary design for increasing energy efficiency of thermal distribution network by using the wate thermal energy from the condensation process in cogeneration thermal power plant TETO in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system. Total heat analyzed from condensation process Q=19MW. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 27 | April 2021 |
Detailed design for heating and ventilation of Transit centre facility for homeless dogs, planned for the construction on cadastral plot 326 in municipality of Kichevo. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, total design head building load 72.5 kW. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 28 | February 2021 |
Detailed design for district heating network construction of secondary pipeline B1.190.290.070.025 from existing pipeline on Street of Kozara 30 to newly designed pipeline section on street Kozara 24. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 100, route length, L=57m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 29 | February 2021 |
Detailed design for district heating network construction of pipeline for building on street 1613, located on cadastral plot 1734/18 in municipality of Aerodrom in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 65, route length, L=30m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. |
| 30 | May 2020 |
Detailed design for district heating network reconstruction and development with replacement of existing old equipment with new modern regulatory equipment in some of main existing manholes in order to increase the Efficiency of the overall district heating network in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 250. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 31 | January 2020 |
Detailed design for district heating network reconstruction and diameter increasing of existing secondary pipeline A3.040 from manhole 040 to manhole 090 on Boris Trajkovski Boulevard in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 200, route length, L=490m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals. - Identify project risks - Monitor project progress - Manage project changes |
| 32 | September 2019 |
Detailed design for district heating network construction of secondary pipeline A3.040.040.060 from manhole 040 to manhole 020 on street of 527 in municipality of Kisela Voda in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 80, route length, L=67m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals - Identify project risks - Monitor project progress - Manage project changes |
| 33 | August 2019 |
Detailed design for district heating network household connection from existing manhole 030 to building thermal substation on street Makedonija 13A in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 32, route length, L=25m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals |
| 34 | March 2019 |
Detailed design for district heating network household connection from existing manhole 3600 on pipeline B1.120.020 to thermal substation for new administrative building “Gradska Kuka” of the city of Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 100, route length, L=80m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals - Monitor project progress |
| 35 | December 2018 |
Detailed design for district heating network construction of secondary pipeline B2.020.080 on street of Meksichka in Karposh municipality in city of Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 65, route length, L=102m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals |
| 36 | November 2017 |
Detailed design for district heating network household connection from existing manhole 010 to pipeline section D001, for the new building “National bank of the Republic of Macedonia” in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 100, route length, L=74m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals - Identify project risks - Monitor project progress |
| 37 | April 2017 |
Detailed design for district heating network construction of secondary pipeline B2.270 from new manhole 240 to manhole 050 for buildings in Aleksandria settlement in municipality of Gjorche Petrov in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 250, route length, L=580m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Reviewing of equipment proposals - Monitor project progress - Manage project changes |
| 38 | February 2017 |
Technical engineering solution for district heating pipeline dislocation from section A1.020 to manhole 010 on street of “Filip II Makedonski”, near the new building “National bank of the Republic of Macedonia” in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 350, route length, L=45m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. - Monitor project progress |
| 39 | January 2017 |
Technical engineering solution for district heating household connection from section B1.110 to manhole 025 for Macedonian Philharmonic Hall on street of “Dimitar Vlahov” in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 125, route length, L=26m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 40 | July 2016 |
Detailed design for district heating network reconstruction of secondary pipeline A1.153 and installation of pumping station and other regulating equipment near shopping centre “Ramstor” in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 450, route length, L=15. Positions held: Associate Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Detailed drawing layout design development. |
| 41 | August 2016 |
Detailed design for district heating network construction of household connection A3.110.005 from manhole 015 to the building thermal substation “Cultural centre house” in munincipality of Kisela Voda, Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 50, route length, L=25m. Positions held: Chief Mechanical Designer Activities performed: - Thermal and hydraulic calculation. - Pipeline strength calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. - Material and equipment specification preparation. |
| 42 | March 2016 |
Design and strength analysis of special fixing support for aboveground pipeline with diameter DN 700. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline section diameter DN 700. Positions held: Associate Mechanical Designer Activities performed: - Pipeline strength calculation. - Detailed drawing layout design development. - Material and equipment specification preparation. |
| 43 | January 2016 |
Detailed design for district heating network reconstruction of secondary pipeline C1.020.180 and pumping station construction on street of Mihail Chakov, near Heating Plant of “11 Oktomvri” in Kisela Voda munincipality in Skopje. | Main project features:
Engineering design for reliable and optimal energy efficient thermal system, pipeline diameter DN 400, route length, L=30m. Positions held: Associate Mechanical Designer Activities performed: - Hydraulic calculation. - Detailed drawing layout design development. - Optimization and energy efficient design. |
| 44 | March 2013 |
Design and Construction of a heating and cooling system in individual residential house. | Main project features:
Engineering construction for reliable and optimal energy efficient thermal system, water/water heat pump with heating capacity of 100 kW Positions held: Associate Mechanical Designer and Constructor Activities performed: - Мaterials specification check. - Preparation of basic design layouts and drawings. - Organizing the transport of equipment and materials. - Daily checking over performed work and reporting in main construction book. - Inspection, commissioning and testing of system. |
| 45 | May 2013 |
Design and Construction of drying chamber for dried meat products based on heat pump system in the meat industry MIK DOO – Sveti Nikole | Main project features:
Engineering construction for reliable and optimal energy efficient thermal system, air/air base heat pump with thermal capacity of 200 kW and total product capacity of 5000 kg of meat. Positions held: Associate Mechanical Designer and Constructor Activities performed: - Мaterials specification check. - Preparation of basic design layouts and drawings. - Organizing the transport of equipment and materials. - Daily checking over performed work and reporting in main construction book. - Inspection, commissioning and testing of system. |
| 46 | July 2013 |
Construction of deep-freezing chamber for meat. | Main project features:
Engineering construction for reliable and optimal energy efficient thermal system, air to air refrigeration system with cooling capacity of 2000 kW, and meat freezing at -35°C Positions held: Associate Mechanical Constructor Activities performed: - Мaterials specification check. - Organizing the transport of equipment and materials. - Daily checking over performed work and reporting in main construction book. - Inspection, commissioning and testing of system. |
| Email: | [email protected] |
| Phone: | +389 79 33 13 55 |
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment in case of an award.
|
Date: ___________________ Place: __________________ |
Signature: ___________________ |